project name | heze ski resort | project introduction | tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel. |
---|---|---|---|
project date | 2020.09 | equipment used | ls16*2、ls2*1、f2*1、g612*200 |
project location | heze city, shandong province | project requirements | picture synchronization; uniformly control the playback of all screens; maximize playback effect. |