project name |
guizhou geological museum |
project introduction |
there are three screens, a tunnel screen, a three fold screen on the wall and a conventional screen, all of which are p2 modules. |
project date |
2022.06 |
equipment used |
kommander f2*2,ks8800,ls16*8,g612c*481 |
project location |
guiyang city, guizhou province |
project requirements |
the tunnel screen uses kommonder t3 server, ks8800 and sv16 * 4 load. each sv16 is connected with two hdmi and two dvi signals. the field word is spliced into four pictures, so as to realize point-to-point display, and the resolution of the whole screen i |