project name | inner mongolia maisha ktv | project introduction | outdoor p5 |
---|---|---|---|
project date | 2020.01 | equipment used | g612、s2、ks910p、t1 |
project location | hohhot | project requirements | 1. wrong coordinate of step position and wrong layer of half - tensioned module, requiring the picture as a whole 2. point-to-point display 3. simple operation, drag-and-drop playback, automatic material switching |