project name | guizhou qingzhen lesen bar | project introduction | indoor p4 module, 64x64 and 64x32 there is a circular main screen, a dj platform and two four pillars on the front. the walls on both sides are long and the sky curtain is irregular. |
---|---|---|---|
project date | 2020.09 | equipment used | p1、ls4×2 、ls6、 g612×200 |
project location | qingzhen town, guiyang city | project requirements | it is controlled by a computer, and the main screen, wall screen and sky screen display complete pictures. |
view all cases
-
urumqi shenma bar
project name:urumqi shenma bar
project date:2020.01
project location:urumqi
project introduction:the large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45
-
yan'an wuqi science and technology museum
project name:yan'an wuqi science and technology museum
project date:2020.09
project location:yan'an
project introduction:1. an arched screen on the front with a resolution of 2688 * 3008 2 surrounded by an ultra long strip screen, surrounded by three sides, with a resolution of 45952 * 896 3 an arc screen, resolution: 3840 * 1024 4 the two circles are called
-
guangxi baise garden expo
project name:guangxi baise garden expo
project date:2020.11
project location:guangxi
project introduction:three screens on the left, middle and right floor tile screen, showing a complete picture on four sides
-
a bar in zunyi
project name:a bar in zunyi
project date:2020.07
project location:zunyi
project introduction:control all led screens with effects on the resolume software
-
datang network exhibition hall
project name:datang network exhibition hall
project date:2020.12
project location:jinan city, shandong province
project introduction:special shaped triangular module, three sides of the whole screen.
-
xincaichen nanning (under construction) factory
project name:xincaichen nanning (under construction) factory
project date:2021.11
project location:nanning city, guangxi province
project introduction:p2-3m diameter ball module, fm6353-5958-40s, nine special-shaped modules, spherical screen, box installation.
-
shougang international qinhuangdao logistics base
project name:shougang international qinhuangdao logistics base
project date:1970.01
project location:qinhuangdao
project introduction:full screen 22 transparent screen, need full screen display screen, shooting effect is good.
-
shenyang wedding hotel
project name:shenyang wedding hotel
project date:2020.01
project location:shenyang
project introduction:four pillar screens, four side screens, one awning
-
ordos kangbashi sweat factory bar
project name:ordos kangbashi sweat factory bar
project date:2020.11
project location:erdos
project introduction:point to point display and unified broadcast control