project name | xigaze tide card plus | project introduction | 1. there is a main screen on the front and a dj console on both sides of the main screen the top surface is an annular screen composed of 8 arcs, and both the inner and outer arcs have screens; there is also a spherical screen in the middle of the sky cur |
---|---|---|---|
project date | 2020.09 | equipment used | g612*400、es16*4,es2*30 |
project location | xigaze, tibet | project requirements | 1. one computer centrally controls all large screen images 2. all pictures can be played freely and controlled by using 6-channel graphics card channel. |
view all cases
-
ordos kangbashi sweat factory bar
project name:ordos kangbashi sweat factory bar
project date:2020.11
project location:erdos
project introduction:point to point display and unified broadcast control
-
shenyang wedding hotel
project name:shenyang wedding hotel
project date:2020.01
project location:shenyang
project introduction:nine door screens and one canopy
-
xigaze tide card plus
project name:xigaze tide card plus
project date:2020.11
project location:tibet
project introduction:front main screen top ring screen four perimeter strip screen spherical screen in the sky screen.
-
penglai space bar
project name:penglai space bar
project date:2020.01
project location:penglai
project introduction:various different screens display 2, p4 modules independently, high refresh, do rotation, with hub port offset.
-
a bar in zunyi
project name:a bar in zunyi
project date:2020.07
project location:zunyi
project introduction:control all led screens with effects on the resolume software
-
shenzhen baoan creative museum
project name:shenzhen baoan creative museum
project date:2020.01
project location:
project introduction:2304×1536,p4
-
shenyang wedding hotel
project name:shenyang wedding hotel
project date:2020.01
project location:shenyang
project introduction:four pillar screens, four side screens, one awning
-
guangxi baise garden expo
project name:guangxi baise garden expo
project date:2020.11
project location:guangxi
project introduction:three screens on the left, middle and right floor tile screen, showing a complete picture on four sides
-
xincaichen nanning (under construction) factory
project name:xincaichen nanning (under construction) factory
project date:2021.11
project location:nanning city, guangxi province
project introduction:p2-3m diameter ball module, fm6353-5958-40s, nine special-shaped modules, spherical screen, box installation.