project name | changshu zeus bar | project introduction | there are four sky curtains and two long screens on the left and right sides. |
---|---|---|---|
project date | 2021.04 | equipment used | ls16,g612*80 |
project location | changshu city, jiangsu province | project requirements | 1. the whole picture is displayed on the left and right sides of the sky curtain; 2. computer direct transmission, point-to-point, the overall display screen is smooth without jamming. |